Customization: | Available |
---|---|
After-sales Service: | Local Service Available |
Warranty: | 2 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Top-of-the-range crushing compacting pelletizing machine, excellent degassin and filtering performance for recycling.
The ACS-Pro is the entirely new standard recycling and pelletizing system with optimized super long L/D ratio, filtering ahead of vacuum degassing, specially suit to the waste plastics such as high contaminated and heavily printed recycling and pelletizing.
SPECIFICATIONS
|
|
Machine Model
|
ACS-Pro
|
Target Recycled Material
|
HDPE,LDPE,PP,BOPP,CPP,OPP,PA,PC,PS,PU,ABS,PET
|
Final Product Shape
|
Particles
|
System composition
|
Belt Conveyor, Air Exhausting Device, Sliding Gate, Cutting Compactor with Inverter, Single Screw Extruder, Filtration first, Vacuum Degassing, Pelletizer, Water Cooling Device, Dehydration Section, Conveyor Fan, Product Silo. |
Output Range
|
320kg/h-2100kg/h
|
Feeding Device
|
Belt Conveyor (Standard), Roll Hualing off device (Optional)
|
Compactor Volume
|
800L-2800L
|
Diameter of screw
|
100mm-180mm
|
Material of screw
|
Bimetal
|
L/D of screw
|
50/ 1
|
Heater of barrel
|
Ceramic heater or Far-infrared heater
|
Cooling of Barrel
|
Air cooling of fans through blowers
|
Vacuum deashing exhaust
|
Two Double-zone vacuum degassing system (Standard)
|
Pelletizing type
|
Water-ring pelletizing/ water-strands pelletizing/ Under-water pelletizing
|
Voltage Standard
|
According to the Voltage of the Customer's Location
|
Optioanl device
|
Metal detector, Roll hualing off device, Masterbatch and additives feeder
|
Warranty
|
13 months from the date of bill of lading
|
Technical services
|
project design, factory construction, installation and recommendations, commissioning
|